Orfield Design Kitchen remodel with stainless steel appliances and island

2016 Luxury Remodeling Tour: Orfield Design & Construction, Inc.

952-920-6543 orfielddesign.com Age of the home: Built in 1967 Type of remodel: Main level (all rooms) Remodeling timeline: 14 months Remodeling budget: $200,000 Before: Spaces in this one-level rambler bottlenecked and prevented interaction. By opening the floor plan and repurposing the original function of hightraffic...
Maison kitchen and bath kitchen remodel with wood floors and large white island

2016 Luxury Remodeling Tour: Maison Kitchen + Bath

952-944-2115 maisonshowroom.com Age of the home: Built in 1971 Type of remodel: Everything but the master suite and lower level Remodeling timeline: Four months Remodeling budget: $150,000 Before: Carpet everywhere (very 70s) Challenges: Originally designed by renowned Minnesota architect James Stageberg, the challenge was keeping his...
Detail Design + Build After Kitchen

2015 Luxury Remodeling Tour: Detail Design + Build

Luxury Remodeling Tour Home | Tickets | Information Form2015 Tour: Detail Design + Build651-336-8089 detailhomes.com Age of the home: 59 years Type of remodel: Whole-house remodel Remodeling timeline: 10 months Remodeling budget: $900,000 Before: Closed-off rooms, poor traffic flow, outdated interior. Challenges:...
TJB Homes Home #3

2017 Tour: TJB Homes, Inc.

Home #3
TJB Homes, Inc.
Edina, MN 55424
John-Kraemer-&-Sons-LRT-after,-by-Troy-Thies-Photography

2015 Luxury Remodeling Tour: John Kraemer & Sons, Inc.

2015 Tour: John Kraemer & Sons 952-935-9100jkandsons.com  Age of the home: 93 years Type of remodel: Full kitchen renovation, large mudroom addition, main floor update complete with custom cabinetry, second floor remodel including master suite, bathrooms, and closets, and infrastructure updates to...
Ispiri Kitchen Remodel of North Loop Condo rendering

2016 Luxury Remodeling Tour: Ispiri

651-578-0122 ispiri.com Age of the home: Old warehouse building converted into condos in 2008 Type of remodel: Whole renovation Remodeling timeline: Four months Before: The space felt dark, washed-up, and outdated. Challenges: Remodeling to condo specifications in a short amount of time (the homeowners...
City Homes LLC home #4

2017 Tour: City Homes, LLC.

Home #4
City Homes, LLC
Edina, MN 55416
JKath Design Build + Reinvent

2015 Luxury Remodeling Tour: JKath Design Build + Reinvent

2015 Tour: JKath Design Build + Reinvent612-730-3299 jkath.com Age of the home: Originally built in 1900; remodeled once in 2008 Type of remodel: Whole house Remodeling timeline: Three months Remodeling budget: $370,000 Before: The home was dark and compartmentalized, with a three-story elevator...
Mark D Williams Living Room with Exposed wood beams

2016 Luxury Remodeling Tour: Mark D. Williams Custom Homes

2016 Tour: Mark D. Williams Custom Homes612-251-9750 mdwilliamshomes.com Age of the home: Originally built in 1911 Type of remodel: Whole house Remodeling timeline: Six months Remodeling budget: $500,000 Before: This two-story home was in need of more space (1,000 square feet was added off the...